The Rational Division of Different Functional Zones in Animal Laboratory Projects
In the field of life science research, animal laboratories, as important venues for conducting experiments, the scientificity and rationality of their engineering construction are of crucial importance. The rational division of different functional zones in animal laboratory projects is a key factor to ensure the smooth progress of experiments, the accuracy of experimental results, and the welfare of experimental animals. Guangzhou Cleanroom Construction Co., Ltd. has been deeply engaged in the purification equipment field for many years and has a profound understanding of the needs of animal laboratory projects. Today, we will analyze this key link in detail for you.
The Importance of Functional Zone Division in Animal Laboratories
An animal laboratory is not a simple combination of spaces but a complex system composed of multiple areas with specific functions. The rational division of functional zones can effectively avoid interference between different experimental activities, reduce the risk of cross - contamination, and also facilitate the operation and management of experimenters, improving work efficiency.
Analysis of Main Functional Zones
1. Experimental Animal Breeding Area
This is one of the core areas of an animal laboratory, where experimental animals live and grow. The breeding area needs to have good temperature and humidity control, ventilation, and lighting adjustment conditions to meet the physiological needs of experimental animals. The high - efficiency air purification equipment produced by Guangzhou Cleanroom Construction Co., Ltd. can provide a clean air environment for the breeding area, effectively filtering dust particles, microorganisms, and other pollutants in the air, reducing the risk of animals getting diseases and ensuring the health of experimental animals. For example, our [specific model] air purification unit adopts advanced filtration technology with a filtration efficiency as high as [X]%, which can accurately control the air quality in the breeding area.
2. Experimental Operation Area
Experimenters perform various experimental operations on experimental animals here, such as blood collection, dissection, and surgery. This area requires a strictly sterile environment to avoid contamination during the experiment and affect the experimental results. The clean benches of Cleanroom Construction provide a local high - cleanliness space for the experimental operation area. Its workbench surface is made of high - quality stainless steel, which is corrosion - resistant and easy to clean. The air flow in the work area is uniform and stable, which can effectively remove pollutants generated during the operation and ensure the accuracy and reliability of experimental operations.
3. Waste Treatment Area
Animal experiments generate a large amount of waste, including animal carcasses, experimental waste, and sewage. The rational setting of the waste treatment area is of great significance for environmental protection and biosafety. Guangzhou Cleanroom Construction Co., Ltd. provides professional waste treatment and purification equipment, which classifies and treats different types of waste. For example, our high - temperature sterilization equipment can harmlessly treat animal carcasses and experimental waste to ensure that the waste does not pollute the environment. At the same time, our sewage treatment equipment adopts advanced biological treatment technology, which can effectively remove harmful substances in the sewage and make it meet the discharge standards.
4. Personnel Purification Area
Before entering the experimental area, experimenters need to carry out purification operations such as changing clothes, washing hands, and disinfecting in this area to prevent experimenters from bringing external pollutants into the laboratory. The personnel purification passage designed by Cleanroom Construction is equipped with complete purification facilities, such as air showers, washbasins, and disinfection equipment. The air shower blows the personnel comprehensively with high - speed air flow to remove dust particles attached to clothes and the body surface, providing clean conditions for experimenters to enter the laboratory.
Principles and Methods of Rational Division
Principles
Function - proximity Principle: Areas with similar functions are divided together to facilitate experimental operation and management. For example, the experimental animal breeding area is set adjacent to the related feed storage area and cleaning tool storage area.
Pollution Control Principle: Strictly distinguish between clean areas and polluted areas to avoid cross - contamination. For example, the experimental operation area is set in a relatively clean area, while the waste treatment area is set in a location far from other functional areas and convenient for transporting waste.
Separation of Logistics and People Flow Principle: Reasonably plan the flow routes of experimental animals, experimental supplies, and personnel to avoid mutual interference. For example, set up special animal transportation passages and personnel passages to ensure the smooth progress of the experimental process.
Methods
Scientific Layout Planning: In the design stage of animal laboratory projects, fully consider factors such as the area requirements, spatial relationships, and equipment installation requirements of each functional zone, and draw a detailed layout plan. Guangzhou Cleanroom Construction Co., Ltd. has a professional technical team that can provide scientific and reasonable layout design plans according to the specific needs of customers and the actual situation of the laboratory.
Use of Appropriate Partitions and Purification Facilities: Use partitions to physically separate different functional zones and install corresponding purification equipment, such as air purification units and ventilation ducts, to ensure that the environmental parameters of each functional zone meet the requirements. The partition materials of Cleanroom Construction have good sealing performance and fire - resistance performance, which can effectively prevent the spread of pollutants.
Professional Support from Guangzhou Cleanroom Construction Co., Ltd.
With years of experience in research and development, production, and application in the purification equipment field, Guangzhou Cleanroom Construction Co., Ltd. provides comprehensive professional support for the division of functional zones in animal laboratory projects. We not only provide high - quality purification equipment but also offer one - stop solutions from scheme design, equipment installation and debugging to after - sales service. Our professional technical team can tailor the most suitable purification solutions according to the different needs of customers to ensure the rational division and efficient operation of each functional zone in the animal laboratory.
The rational division of different functional zones is a key link in the construction of animal laboratory projects. Guangzhou Cleanroom Construction Co., Ltd. is willing to cooperate with scientific research institutions and enterprises to jointly create a safe, efficient, and comfortable animal laboratory environment and contribute to the cause of life science research.
Technical Points of Colored Steel Plate Installation on Walls in Animal Laboratories
In the construction of animal laboratories, the selection and installation of wall materials are of great significance. Colored steel plates, with their numerous advantages such as good heat insulation, fire resistance, moisture resistance, as well as being aesthetically pleasing and easy to clean, have become an ideal material for the walls of animal laboratories. As Guangzhou Cleanroom Construction Co., Ltd., which specializes in the production of purification equipment, we deeply understand the importance of colored steel plate installation technology in creating a high - quality animal laboratory environment. Today, we will introduce in detail the technical points of colored steel plate installation on walls in animal laboratories.
I. Preparation Work before Installation
(1) Material and Tool Preparation
Selection of Colored Steel Plates
According to the specific needs of the animal laboratory, select colored steel plates of appropriate specifications and quality. Generally, attention should be paid to the thickness of the colored steel plate, the quality of the coating, the type of core material, etc. For example, for areas with high requirements for environmental cleanliness, colored steel plates with rock wool as the core material can be selected. Rock wool has good fire - resistance, heat - preservation, and sound - insulation properties, and is not easy to breed bacteria. At the same time, ensure that the surface of the colored steel plate is flat, without scratches, deformation, or other defects.
Preparation of Auxiliary Materials
Prepare all kinds of auxiliary materials required for installation, such as sealants, self - tapping screws, angle irons, channel steels, etc. The sealant should have good weather resistance, water resistance, and sealing performance to ensure the sealing effect of the wall; the self - tapping screws should be selected in appropriate specifications according to the thickness of the colored steel plate to ensure firm fixation.
Tool Equipping
The installation tools include electric drills, screwdrivers, cutting machines, spirit levels, straightedges, etc. Ensure that the tools are in good condition and their accuracy meets the requirements. For example, spirit levels and straightedges are used to ensure the verticality and horizontality of wall installation.
(2) On - site Investigation and Planning
Measuring and Marking
Before installation, accurately measure and mark the installation position of the walls in the animal laboratory. Determine the axis position of the walls according to the design drawings, and draw ink lines on the ground and ceiling. Pay attention to error control during the measurement process to ensure that the positions of each wall are accurate, providing a benchmark for subsequent installation.
Wall Base Treatment
Check the condition of the wall base to ensure that the base is flat, firm, and dry. If there are uneven or loose phenomena in the base, leveling and reinforcement treatments are required. For example, for a concrete wall, if there are unevenness, it should be leveled with cement mortar; for an old wall, clean the dust, oil stains, and other impurities on the surface to ensure good adhesion between the colored steel plate and the base.
II. Technical Points during the Installation Process of Colored Steel Plates
(1) Installation of Keels
Selection and Processing of Keels
According to the size of the colored steel plate and the wall structure, select appropriate keel materials. Generally, light - steel keels are used. Process the keels, cut them into corresponding lengths according to the measured and marked positions, and carry out rust - removal and anti - corrosion treatments.
Installation and Fixation of Keels
First, install the vertical keels, fix them to the embedded parts or expansion bolts on the ground and ceiling to ensure that the keels are vertical. The spacing of vertical keels should be reasonably set according to the width of the colored steel plate, generally not exceeding 600mm. Then install the horizontal keels, and fix them to the vertical keels through connectors to form a stable keel framework. During the installation process, use a spirit level and a straightedge to check the verticality and horizontality of the keels at any time, and control the deviation within the allowable range.
(2) Installation of Colored Steel Plates
Cutting of Colored Steel Plates
Cut the colored steel plates accurately according to the size of the keel framework. Use a professional cutting machine when cutting to ensure that the cut is neat, smooth, and the size is accurate. Note to leave a certain installation margin to ensure that the colored steel plates are tightly spliced after installation.
Installation Sequence of Colored Steel Plates
Start from one end of the wall and install the colored steel plates one by one. Insert the colored steel plates into the keel framework, making the tongues of the colored steel plates interlock with the tongues of adjacent colored steel plates. Use self - tapping screws to fix the colored steel plates to the keels. The screw spacing is generally 200 - 300mm, evenly distributed around the colored steel plate. During the installation process, check the flatness and verticality of the colored steel plates at any time, and adjust them in time if there are deviations.
Treatment of Yin and Yang Corners
At the yin and yang corners of the wall, special yin and yang corner lines are required for treatment. Fix the yin and yang corner lines to the colored steel plates and keels to ensure that the yin and yang corner lines are straight, beautiful, and enhance the overall stability and sealing performance of the wall.
(3) Sealing Treatment
Sealing of Plate Joints
After the installation of colored steel plates is completed, seal the plate joints. First, use a sealant gun to evenly inject the sealant into the plate joints, fill them fully, and then use a scraper to scrape the sealant flat to make it flush with the surface of the colored steel plate. The sealant should be applied evenly, without missing coating, air bubbles, or other phenomena to ensure the sealing performance of the wall and prevent the entry of dust, microorganisms, etc.
Sealing of Penetrating Holes
For various penetrating holes on the wall, such as holes through which electrical conduits, water pipes, etc. pass, materials with good fire - resistance, water - resistance, and sealing performance should be used for blocking. First, fill the holes with fire - resistant putty, and then apply sealant on the surface to ensure that the holes are tightly sealed and do not affect the environmental control effect of the laboratory.
III. Inspection and Acceptance after Installation
(1) Appearance Inspection
Overall Flatness
Observe whether the colored steel plate wall is overall flat, without obvious unevenness. Use a straightedge to check the flatness of the wall, and the deviation should meet the relevant standard requirements, generally not exceeding 2mm.
Quality of Plate Joints
Check whether the plate joints of the colored steel plates are uniform and straight, whether the sealant is applied smoothly and without cracking or falling off. The width of the plate joints should be controlled within the design requirements, generally 3 - 5mm.
Effect of Yin and Yang Corners
Check whether the yin and yang corner lines are firmly installed, whether the lines are straight, and whether the angles of the yin and yang corners meet the requirements, generally 90°.
(2) Performance Testing
Sealing Performance Testing
Use methods such as smoke testing or pressure testing to test the sealing performance of the wall. Create a certain concentration of smoke inside the laboratory and observe whether there is smoke leakage outside the wall; or pressurize the inside of the laboratory and detect the pressure drop rate to determine whether the sealing effect of the wall meets the requirements.
Strength Testing
Check whether there are hollow sounds by tapping the colored steel plate wall to determine whether the connection between the colored steel plate and the keel is firm. If necessary, professional testing instruments can be used to test the strength of the wall to ensure that the wall can withstand a certain external force and meet the use requirements of the animal laboratory.
In the installation process of colored steel plates on the walls of animal laboratories, from the preparation work in the early stage to the installation process and then to the inspection and acceptance in the later stage, each link has strict technical points. Guangzhou Cleanroom Construction Co., Ltd., with its rich experience and professional technical team, can provide customers with high - quality colored steel plate wall installation services, helping to create a high - quality animal laboratory environment and providing a solid guarantee for the smooth progress of scientific research work.
Detailed Explanation of Acceptance Standards and Procedures for Animal Laboratory Projects
In the field of scientific research, animal laboratories serve as crucial venues for various experiments. The engineering quality of these laboratories directly impacts the accuracy and reliability of experimental results. For Guangzhou Cleanroom Construction Co., Ltd., which specializes in the production of purification equipment and provides professional equipment support for animal laboratories, it is of great significance to have a deep understanding of the acceptance standards and procedures for animal laboratory projects. Today, let's explore this topic in detail.
I. Acceptance Standards for Animal Laboratory Projects
(1) Site Selection and Layout Standards
Environmental Site Selection
Animal laboratories should be far away from railways, docks, airports, traffic arteries, as well as factories, storage warehouses, and yards that emit a large amount of dust and harmful gases, to avoid severe air pollution, vibration, or noise interference. If it is impossible to be far away, they need to be arranged on the downwind side of the minimum frequency wind direction in summer in the local area. At the same time, the experimental animal experimental facilities should be kept at a distance of more than 50 meters from the living area to prevent mutual interference.
Internal Layout
A reasonable area division is the basis for ensuring the efficient operation of the laboratory. Generally, animal laboratories can be divided into the front area (including offices, maintenance rooms, warehouses, feed rooms, general corridors, etc.), the animal production area (such as quarantine rooms, buffer rooms, breeding rooms, etc.), the animal experimental area (buffer rooms, air shower rooms, quarantine rooms, etc.), and the auxiliary area (warehouses, washing and disinfection rooms, temporary storage rooms for waste items, etc.). Each area has a clear function, and through a reasonable passage design, the effective flow of personnel, animals, materials, and waste is realized to avoid cross - contamination.
(2) Building Hygiene Standards
Enclosure Structure Materials
The enclosure structure materials of the laboratory must be non - toxic and non - radioactive to ensure that they do not harm the health of experimental animals and laboratory personnel. The wall materials should be corrosion - resistant, not easy to fall off, impact - resistant, and non - reflective; the floor materials need to be non - slip, wear - resistant, and free of leakage for easy cleaning and maintenance; the ceiling materials should be water - resistant and corrosion - resistant to adapt to the special environmental requirements of the laboratory.
Requirements for Doors, Windows, and Corridors
The doors and windows of the building need to be well - sealed to prevent the entry of external pollutants. The width of the corridor should generally be ≥ 1.5m to facilitate the passage of personnel and equipment. For non - human primate animal laboratories, wire meshes should also be installed on the doors and windows of the breeding rooms to ensure the safety of animals.
(3) Facility and Equipment Standards
Ventilation and Air - Conditioning System
The ventilation and air - conditioning system is one of the key facilities in the animal laboratory. This system needs to maintain positive pressure operation, rationally organize the air flow, and scientifically arrange the positions of air supply and exhaust outlets to avoid air flow dead corners and cut - off phenomena. At the same time, it is necessary to ensure that various environmental control equipment is regularly maintained to stably maintain environmental indicators such as temperature, humidity, and air quality in the laboratory.
Electrical System
The power distribution equipment in the animal laboratory should be installed concealed, and equipment that is not easy to accumulate dust should be selected. An emergency power supply should be equipped to ensure the stability of power supply during the experiment. The electrical pipelines need to be laid concealed, and the pipe openings of the electrical pipelines entering the clean area from the non - clean area must be well - sealed to prevent dust and microorganisms from entering the clean area.
Animal Breeding and Experimental Equipment
Animal breeding cages, operating tables, experimental instruments, and other equipment should meet the corresponding experimental animal grade standards. For example, animal experiments with infectious diseases must be carried out under negative pressure conditions, and strict measures to prevent the leakage of harmful substances should be set up. Facilities above the barrier environment should also be equipped with detection instruments such as differential pressure gauges, and complete detection records should be kept.
II. Acceptance Procedures for Animal Laboratory Projects
(1) Application Stage
After the completion of the laboratory construction, the construction unit needs to submit an acceptance application to the relevant competent department. The application materials usually include detailed information on the laboratory construction project, such as design drawings, construction records, equipment lists, environmental test reports, etc., to prove that the laboratory has followed relevant standards and specifications during the construction process.
(2) On - site Inspection Stage
Formation of the Acceptance Expert Group
An acceptance group is formed by experts in the field of experimental animals, with no less than 3 members. The experts conduct a comprehensive inspection of the laboratory based on relevant standards and specifications.
Document Review
The acceptance experts first review the document materials submitted by the applicant unit to confirm whether the construction of the laboratory meets the design requirements, whether the construction process is standardized, and whether the various records are complete.
Field Inspection
The various areas of the laboratory are inspected on - site, including site selection and layout, building hygiene conditions, and the operation of facilities and equipment. Each key indicator of the laboratory is tested on - site, such as the wind speed, temperature and humidity of the ventilation and air - conditioning system, the safety of the electrical system, and the performance of animal breeding and experimental equipment.
(3) Result Evaluation Stage
Classification of Defect Items
During the inspection process, items that are incomplete, not comprehensive, or do not meet the standards will be identified as defect items. Among them, the failure of key items is called a serious defect, and the failure of general items is called a general defect.
Judgment of Acceptance Results
The acceptance results are judged based on the number and nature of the defect items. If there are no serious defects in key items and the number of general defects is within a certain proportion, the acceptance is passed, but the defect items need to be rectified; if there are serious defects or the number of general defects exceeds the specified proportion, a second acceptance may be required after rectification within a time limit.
(4) Rectification and Re - inspection Stage
Rectification Requirements
For the problems found during the acceptance process, the construction unit needs to complete the rectification work within the specified time according to the rectification opinions put forward by the experts and submit a rectification report.
Re - inspection and Acceptance
After the rectification is completed, the acceptance expert group will conduct a re - inspection of the rectification situation to confirm whether the rectification measures are effective and whether the laboratory has reached the acceptance standards. Only after passing the re - inspection and acceptance can the animal laboratory project be officially considered as passed the acceptance.
The acceptance standards and procedures for animal laboratory projects cover all aspects from site selection and layout to facilities and equipment, and from application to final acceptance. Guangzhou Cleanroom Construction Co., Ltd., with its professional purification equipment, provides a strong guarantee for the environmental control of animal laboratories, helps laboratories pass the acceptance smoothly, and lays a solid foundation for scientific research. Only by strictly following the acceptance standards and procedures can a high - quality, safe, and reliable animal laboratory be built to promote the steady progress of scientific research.
Food Factory Cleanroom Equipment Providing Professional Support for Your Business
In today's highly competitive food industry, ensuring efficient, hygienic, and safe production processes is the core need of every food business. As a professional food factory cleanroom equipment manufacturer from China, we are dedicated to providing high-quality, diverse, and customizable cleanroom equipment to global customers, helping your food production business reach new heights.
Rich and Diverse Product Line
Our products cover all aspects of food factory operations, from employee hygiene to production environment control, ensuring comprehensive solutions.
Employee Hygiene We offer stainless steel shoe benches to provide employees with comfortable shoe-changing areas; stainless steel lockers to ensure neat storage of employee clothing; hand washing, drying, and disinfection all-in-one machines to strictly control hand hygiene and prevent bacterial spread; employee hygiene stations that integrate multiple functions to comprehensively ensure hygiene before entering production areas. Additionally, we provide shoe drying and disinfection machines to effectively eliminate odors and bacteria from shoes.
Production Environment Control We provide various types of air showers, including standard/fully automatic air showers, goods air showers, sliding door air showers, and built-in sliding door air showers, effectively removing dust and particles from personnel and goods. Built-in pass-through windows and air shower pass-through windows facilitate the transfer of items between different clean areas while maintaining cleanliness.
We also offer a range of stainless steel washing sinks and mop sinks to meet different cleaning needs; negative pressure weighing rooms to ensure precise and safe weighing processes; stainless steel collision-proof doors that ensure convenient access to workshops while preventing damage from collisions.
Air Filtration and Purification Our products include FFU filtration units, high-efficiency supply air outlets, nylon初效 filters, and pleated activated carbon filters, effectively filtering pollutants from the air and creating a clean air environment for food production.
Laboratory and Storage Equipment We provide central laboratory benches, laboratory side benches, standard fume hoods, storage cabinets, reagent cabinets, and sample cabinets, meeting various laboratory and storage requirements.
Customized Services to Meet Your Unique Needs
We understand that every food factory has its unique production processes and requirements. Therefore, we offer customized services tailored to your specific needs, from the size, material, to the functional configuration of the equipment. Whether it's a special production environment or a unique production process, our professional team can create the most suitable auxiliary equipment for you.
Why Choose Us?
- Quality Assurance: We use high-quality materials and advanced production processes to ensure that every piece of equipment meets strict quality standards. All products undergo rigorous testing and inspection to guarantee their stable performance and durability.
- Professional Team: We have an experienced and highly skilled R&D and production team with in-depth understanding of the food industry's needs, providing you with professional technical support and solutions.
- Global Service: Our website is open to global customers, allowing you to conveniently browse our product information and consult related questions regardless of your location. We also offer comprehensive after-sales service to ensure you have no worries during use.
If you are looking for a reliable supplier of cleanroom equipment for food factories, come and visit our website. We believe that our extensive product line and customized services will meet your business needs and safeguard your food production.
Electrical and Water Layout Strategies for Animal Laboratories Based on Experiment Types
In the construction of animal laboratories, the layout of electrical and water systems is not merely a simple infrastructure setup. Instead, it is closely related to the types of experiments and directly impacts the efficiency, safety, and accuracy of experiments. Guangzhou Cleanroom Construction Co., Ltd., a professional manufacturer deeply engaged in the purification equipment field, understands the significance of this. Next, we will analyze the electrical and water layout strategies for animal laboratories based on experiment types.
Basic Research - Oriented Animal Laboratories: Emphasizing Stability and Flexibility
Basic research - oriented experiments often require long - term and continuous observation and detection of basic characteristics such as animal physiology and pathology. These laboratories have extremely high requirements for the stability of water and electricity supply. Even a brief interruption can lead to the loss of precious experimental data.
Regarding the electrical layout, a dual - circuit power supply system should be equipped. One circuit serves as the regular power supply, and the other as the emergency backup to ensure that experimental equipment operates continuously. Sufficient power sockets should be evenly distributed in the laboratory bench area, and different specifications should be set according to equipment requirements. For example, sockets with voltage - stabilizing functions are used for precision instruments such as microscopes to meet the strict requirements of equipment for current stability. Considering the possible addition of new equipment in the future, it is advisable to reserve 20% - 30% of spare socket points.
In terms of waterways, in addition to regular domestic water, experimental water is more crucial. An independent pure water supply system should be set up, using multi - stage filtration and reverse osmosis technologies to provide high - quality pure water for experiments such as cell culture and biochemical analysis. The materials of water pipes should be corrosion - resistant stainless steel or PPR pipes to prevent water pollution. At the same time, the layout of water pipes should be reasonably planned to avoid crossing with circuits, preventing safety accidents caused by water leakage.
Drug R & D - Oriented Animal Laboratories: Precise Control and Safety Assurance
Drug R & D involves a large number of drug syntheses, tests, and animal efficacy evaluations, and attaches great importance to the precise control and safety of the experimental environment.
The power system needs to provide pure and stable power for various high - precision experimental equipment, such as high - performance liquid chromatographs and mass spectrometers. To this end, special power purification devices need to be installed to reduce current fluctuations and electromagnetic interference. At the same time, for some equipment that generates a large amount of heat, such as ovens and centrifuges, independent heat dissipation and ventilation systems should be equipped to ensure the normal operation of the equipment and reduce energy consumption.
In the waterway layout, in addition to meeting the pure water requirements of basic research - oriented laboratories, the impact of special chemical reagents that may be used in the drug synthesis process on water quality should also be considered. Some experiments may require ultrapure water, which requires the installation of a higher - level water purification device. In addition, due to the risk of chemical reagent leakage during drug R & D, floor drains should be set on the laboratory floor. The drainage system should have acid and alkali corrosion resistance and be strictly separated from the ordinary drainage system to prevent cross - contamination. Drainage pipes need to be regularly inspected and maintained to ensure smooth drainage.
Infectious Disease Research - Oriented Animal Laboratories: Strict Isolation and Prevention
Infectious disease research - oriented animal laboratories often deal with highly pathogenic pathogens, and the electrical and water layout must focus on strict isolation and prevention.
In the electrical layout, it is necessary to ensure that the negative - pressure system and ventilation purification system of the laboratory operate continuously for 24 hours. This is related to preventing the internal air of the laboratory from leaking into the external environment and ensuring the safety of personnel and the environment. All electrical equipment must have explosion - proof and sealing functions to avoid the risk of pathogen leakage caused by electric sparks. Lighting fixtures should also be of the sealed type for easy cleaning and disinfection.
In terms of waterways, an independent water supply and drainage system should be set up inside the laboratory, completely isolated from the outside world. The water supply pipes should be regularly disinfected to prevent the growth of pathogens. The drainage system needs to be equipped with an efficient disinfection device to strictly disinfect the discharged sewage before it enters the municipal pipe network. Facilities such as sinks should be set near the laboratory exit for experimental personnel to wash their hands and disinfect before leaving the laboratory. At the same time, the floor inside the laboratory should be made of waterproof, non - slip, and easy - to - clean materials to facilitate timely cleaning and disinfection in case of liquid leakage.
With years of rich experience in the construction of animal laboratories, Guangzhou Cleanroom Construction Co., Ltd. can tailor scientific and reasonable electrical and water layout solutions for you according to different experiment types. From planning and design to installation and commissioning, we provide one - stop services to ensure the stable, efficient, and safe operation of the electrical and water systems in your animal laboratory, escorting your scientific research work. If you are preparing an animal laboratory construction project, please feel free to contact us at any time to jointly create a high - quality experimental environment.